Narva linn, Joala tn 13, Joala tn 15, Kose tn 1a, Kose tn 3 korteriühistu · 80170785

Apartment association bills, payments and debtsDebt claimsLate-payment interest and consequences of delayInstalments and payment schedules

How it started · editorial summary

The agreed costs are included in the schedule; delay permits recovery of the balance.

· Court orderViru Maakohus · First instance · № 2-25-14771/10Read actFirst instance

Separate act page

Joala–Kose: settlement on payment of arrears

Court order · Viru Maakohus · First instance

Narva linn, Joala tn 13, Joala tn 15, Kose tn 1a, Kose tn 3 korteriühistu · 80170785

Entry into force has not been reverified

Participants and roles: applicant — Narva linn, Joala tn 13, Joala tn 15, Kose tn 1a, Kose tn 3 korteriühistu; person concerned — debtor XX

How it started · editorial summary

The agreed costs are included in the schedule; delay permits recovery of the balance.

The dispute and the court’s decision

Narva linn, Joala tn 13, Joala tn 15, Kose tn 1a, Kose tn 3 korteriühistu and debtor XX submitted a settlement concerning management charges and late-payment interest. The court found it permissible and capable of performance, approved it and discontinued proceedings. The acknowledged obligation includes 25 euros in agreed litigation costs. This is already included in the schedule and is not recoverable again separately. There are 27 payments of varying amounts, including higher seasonal payments; larger payments are permitted. An insufficient or late payment makes the entire unpaid balance recoverable through a bailiff. Full performance leaves no additional claims arising from this case. Other costs remain with each party; a refund of 25 euros, half the state fee, is ordered to the association after the order’s entry into force. The order does not establish performance of the schedule.

Outcome of this decision

A settlement with 27 payments and acceleration of the balance on breach was approved; proceedings were discontinued.
Translation of an anonymised, abridged excerpt from Estonian
2. Discontinue the civil proceedings.

Narva linn, Joala tn 13, Joala tn 15, Kose tn 1a, Kose tn 3 korteriühistu · 80170785

Apartment association bills, payments and debtsDebt claims

How it started · editorial summary

After full repayment, the association waived its application and requested half the fee back and the remainder from two debtors XX.

· Court ruling accepting waiver of an applicationViru Maakohus · First instance · № 2-25-14770/13Read actFirst instance

Separate act page

Joala–Kose association: termination after payment and joint and several costs

Court ruling accepting waiver of an application · Viru Maakohus · First instance

Narva linn, Joala tn 13, Joala tn 15, Kose tn 1a, Kose tn 3 korteriühistu · 80170785

Entry into force has not been reverified

Participants and roles: applicant — Narva linn, Joala tn 13, Joala tn 15, Kose tn 1a, Kose tn 3 korteriühistu; two interested persons XX — jointly and severally obliged to reimburse costs

How it started · editorial summary

After full repayment, the association waived its application and requested half the fee back and the remainder from two debtors XX.

The dispute and the court’s decision

Narva linn, Joala tn 13, Joala tn 15, Kose tn 1a, Kose tn 3 korteriühistu sought debt from two individuals XX. During the case it supplied a payment document confirming full repayment. After a clarifying court question, it expressly waived its application, sought termination and refund of half the fee paid. It requested the other half against the debtors. On 16 December 2025 the court accepted the waiver and terminated proceedings. The basis was satisfaction during proceedings, confirmed by the payment document. The court did not award principal again or approve a settlement. Costs were allocated to both interested persons jointly and severally: one common 25 euro amount was awarded to the association, recoverable from either, rather than 25 euros from each. The court applied the costs rule for waiver after the other party satisfies the demand following the application to court. A further 25 euros, half the fee, is to be refunded to the association from the budget after entry into force. The refund and joint and several reimbursement of the remainder are two separate outcomes.

Outcome of this decision

Accept the waiver and terminate the case. Award 25 euros in costs jointly and severally against the two interested persons; refund the association a further 25 euros in fees after entry into force.
Translation of an anonymised, abridged excerpt from Estonian
2. Terminate the civil proceedings.

Narva linn, Kangelaste prospekt 12a korteriühistu · 80137948

Apartment association bills, payments and debtsDebt claims

How it started · editorial summary

In payment-order proceedings, the association and debtor XX agreed to discharge the acknowledged obligation in a single payment.

· Order approving a settlement and ending proceedingsViru Maakohus Narva kohtumaja · First instance · № 2-25-124829/3Read actFirst instance

Separate act page

Kangelaste prospekt 12a: payment of debt in a single payment

Order approving a settlement and ending proceedings · Viru Maakohus Narva kohtumaja · First instance

Narva linn, Kangelaste prospekt 12a korteriühistu · 80137948

Entry into force has not been reverified

Participants and roles: Applicant — Narva linn, Kangelaste prospekt 12a korteriühistu; Person concerned, debtor — XX

How it started · editorial summary

In payment-order proceedings, the association and debtor XX agreed to discharge the acknowledged obligation in a single payment.

The dispute and the court’s decision

Narva linn, Kangelaste prospekt 12a korteriühistu began expedited payment-order proceedings against debtor XX. After service, the participants submitted a written agreement and the case was transferred to Viru Maakohus. On 25 November 2025, that court considered the settlement before examining the debt application itself. The debtor acknowledged the claim and agreed to reimburse 45 euros in costs: 25 euros in state fees and 20 euros in other procedural costs. The association waived other claims. A single payment by the agreed deadline was required; early performance was permitted. The court corrected the draft’s mistaken reference to instalments, because no instalments had been agreed. The revised clause makes the entire unpaid balance enforceable if the single payment is late in whole or in part. After performance, no mutual claims remain in the case. The court approved the permissible, enforceable settlement and ended proceedings. Each participant bears other costs; no further reimbursement was ordered. The agreed appeal period was two days from service, through Viru Maakohus to Tartu Ringkonnakohus.

Outcome of this decision

Approve the settlement on the debt and 45 euros in costs, payable in one payment by the agreed deadline; correct the reference to instalments. Full or partial delay makes the entire unpaid balance enforceable. End the proceedings.
Translation of an anonymised, abridged excerpt from Estonian
2.4. If payment specified in clause 2.2 is delayed, including in part, the entire unpaid debt is recoverable in enforcement proceedings (compulsory enforcement). […] 3. End the civil proceedings.

Narva linn, Kangelaste prospekt 49 korteriühistu · 80162811

Apartment association bills, payments and debtsDebt claimsLate-payment interest and consequences of delayInstalments and payment schedules

How it started · editorial summary

Owner XX and the association agreed on instalments after the debt claim was contested.

· Court orderViru Maakohus · First instance · № 2-25-102277/28Read actFirst instance

Separate act page

Instalments and waiver of accrued interest

Court order · Viru Maakohus · First instance

Narva linn, Kangelaste prospekt 49 korteriühistu · 80162811

Entry into force has not been reverified

Participants and roles: applicant — Narva linn, Kangelaste prospekt 49 korteriühistu; person concerned, apartment owner — XX

How it started · editorial summary

Owner XX and the association agreed on instalments after the debt claim was contested.

The dispute and the court’s decision

Narva linn, Kangelaste prospekt 49 korteriühistu claimed management-charge arrears and interest from owner XX. Following an objection, the payment-order case was transferred and the claim amended. The court approved the participants’ settlement and terminated proceedings without deciding the original dispute on its merits. XX undertook to pay the debt and 750 euros of the association’s costs in twelve monthly instalments. The association waived accrued interest. Current bills must be paid separately on time. Delay in at least two instalments, or another breach of the instalment condition, allows immediate recovery of the balance and interest at 0.02%; the text specifies no period for that rate. Proper performance leaves no association claim for the period covered by the settlement. Other costs remain with the participants; the appeal period was reduced to one day after service.

Outcome of this decision

Settlement on instalments and costs approved with a waiver of accrued interest; proceedings terminated.
Translation of an anonymised, abridged excerpt from Estonian
2. Terminate proceedings in civil case no. 2-25-102277.

Narva linn, Mõisa tn 3 korteriühistu · 80152244

Apartment association bills, payments and debtsDebt claimsInstalments and payment schedules

How it started · editorial summary

Following an objection in payment-order proceedings, the association and XX submitted a clarified agreement acknowledging debt and setting instalments.

· Order approving a settlementViru Maakohus Narva kohtumaja · First instance · № 2-25-120462/7Read actFirst instance

Separate act page

Mõisa tn 3: instalments for utility and management arrears

Order approving a settlement · Viru Maakohus Narva kohtumaja · First instance

Narva linn, Mõisa tn 3 korteriühistu · 80152244

Entry into force has not been reverified

Participants and roles: Applicant — Narva linn, Mõisa tn 3 korteriühistu; Person concerned, debtor — XX

How it started · editorial summary

Following an objection in payment-order proceedings, the association and XX submitted a clarified agreement acknowledging debt and setting instalments.

The dispute and the court’s decision

Narva linn, Mõisa tn 3 korteriühistu began payment-order proceedings against XX. XX objected in time and later corrected a missing signature. The case went to Viru Maakohus. The participants submitted a settlement and clarified it at the court’s suggestion. On 16 October 2025, the court approved the amended text before considering the debt application itself. It covers utility and management costs. XX acknowledged the principal and agreed to reimburse 45 euros in costs: 25 euros in state fees and 20 euros in other procedural costs. Twenty-two monthly payments and early repayment were permitted. Full or partial delay makes the entire unpaid balance enforceable. Regular payment of current costs remains required. After performance, no mutual claims remain in the case. The court found the terms permissible and enforceable and ended proceedings. Each bears other costs. The agreed appeal period was two days from service. Performance of the schedule is not established.

Outcome of this decision

Approve monthly payment of the principal and 45 euros in costs. Full or partial delay makes the entire unpaid balance enforceable. Current costs remain payable. End proceedings.
Translation of an anonymised, abridged excerpt from Estonian
2.5. If instalments specified in clause 2.2 are delayed, including in part, the entire unpaid debt is recoverable in enforcement proceedings (compulsory enforcement). […] 3. End the civil proceedings.

Narva linn, V. Gerassimovi tn 16 korteriühistu · 80218960

Apartment association bills, payments and debtsDebt claimsInstalments and payment schedules

How it started · editorial summary

The association and XX agreed on instalments and a specific term concerning breach of the schedule.

· Order approving a settlement and ending proceedingsViru Maakohus · First instance · № 2-25-117353/3Read actFirst instance

Separate act page

V. Gerassimovi tn 16: debt and breach of the payment schedule

Order approving a settlement and ending proceedings · Viru Maakohus · First instance

Narva linn, V. Gerassimovi tn 16 korteriühistu · 80218960

Entry into force has not been reverified

Participants and roles: Applicant — Narva linn, V. Gerassimovi tn 16 korteriühistu; Debtor — XX

How it started · editorial summary

The association and XX agreed on instalments and a specific term concerning breach of the schedule.

The dispute and the court’s decision

Narva linn, V. Gerassimovi tn 16 korteriühistu sought a debt from XX. After service of the payment proposal, the participants submitted an agreement. Pärnu Maakohus ended expedited payment-order proceedings and transferred the case to Viru Maakohus. On 16 September 2025, the court approved the acknowledgment of utility arrears and monthly payments over one year. Current bills remain payable. On breach, including failure to pay at least one instalment in full or in part, the agreement allows the association unilaterally to treat it as invalid. This operative part has no separate clause making the entire balance immediately recoverable. The court found the settlement permissible and enforceable and ended the case without deciding the original dispute on its merits. Participants bear costs outside the agreement; no additional reimbursement was awarded. An appeal was possible within 15 days of service. Subsequent payment is not established.

Outcome of this decision

Approve acknowledgment of the debt and monthly payments. Current bills remain payable. On breach, the association may unilaterally treat the agreement as invalid. End proceedings; participants bear costs outside the agreement.

A checked extract in this language is not yet available.

Narva linn, Tallinna mnt 56 korteriühistu · 80121574

Apartment association bills, payments and debtsDebt claimsBills and justification of chargesApartment association board and managementAuthority and representationContracts and servicesBuilding servicesLate-payment interest and consequences of delay

How it started · editorial summary

Principal and late-payment interest were paid during the case. Disputes remained over costs, representation and XX’s additional requests.

· Order on a debt claim and the owner’s additional applicationViru Maakohus · First instance · № 2-24-11592/15Read actFirst instance

Separate act page

Tallinna mnt 56: payment during proceedings, costs and representation

Order on a debt claim and the owner’s additional application · Viru Maakohus · First instance

Narva linn, Tallinna mnt 56 korteriühistu · 80121574

Entry into force has not been reverified

Participants and roles: Applicant — Narva linn, Tallinna mnt 56 korteriühistu; Person concerned, owner and addressee of the monetary claim — XX; Association’s representative — XX; Board member whose authority was challenged — XX

How it started · editorial summary

Principal and late-payment interest were paid during the case. Disputes remained over costs, representation and XX’s additional requests.

The dispute and the court’s decision

Narva linn, Tallinna mnt 56 korteriühistu sought management-cost arrears from XX. The amended claim covered principal and accrued late-payment interest. The association submitted calculations, supplier and participant invoices and resolutions setting charges. During proceedings, XX acknowledged and paid these sums but disputed liability for the association’s legal costs. XX also challenged the representative’s authority, requested recalculation of gas charges and correction of information in association documents. The court checked the register entry authorising a board member to act alone and another pending case concerning meeting resolutions. In this case, it accepted the register as the basis for representation. The entry had not changed, and litigation over the board member’s removal remained pending. The court found the calculation justified and noted that liability and the acknowledged amounts were no longer disputed. It nevertheless did not award the principal and accrued late-payment interest again, because they had been paid during proceedings. The operative part allows the application but expressly makes no monetary award for those sums because of performance. Requests to recalculate gas and correct document information were dismissed as outside the case’s subject. XX bears the association’s and XX’s own costs. Their amount is left for a separate order after entry into force. The association’s requested figure is not an amount already awarded; a new debt mentioned in its submissions was not awarded by this operative part either.

Outcome of this decision

Allow the association’s application but make no repeat award of principal and accrued late-payment interest because they were paid during proceedings. Dismiss XX’s requests for gas recalculation and correction of association documents as outside the case. Order XX to bear association costs, to be quantified separately.

A checked extract in this language is not yet available.

Narva linn, Tallinna mnt 46 korteriühistu · 80170555

Apartment association bills, payments and debtsDebt claimsInstalments and payment schedulesLate-payment interest and consequences of delay

How it started · editorial summary

Two persons XX agreed on joint and several instalments with the association.

· Court orderViru Maakohus · First instance · № 2-24-145726/7Read actFirst instance

Separate act page

Joint and several instalments and breach consequences

Court order · Viru Maakohus · First instance

Narva linn, Tallinna mnt 46 korteriühistu · 80170555

Entry into force has not been reverified

Participants and roles: applicant — Narva linn, Tallinna mnt 46 korteriühistu; two persons concerned XX — joint and several debtors; applicant representative XX

How it started · editorial summary

Two persons XX agreed on joint and several instalments with the association.

The dispute and the court’s decision

The court approved a settlement between Narva linn, Tallinna mnt 46 korteriühistu and two persons XX and terminated proceedings. The settlement preceded the order; participants confirmed compliance with the schedule as of August. This does not establish full repayment or absence of later default. Liability is joint and several: the unpaid balance may be claimed from either debtor without double recovery. The obligation includes management-charge debt, accrued late-payment interest, a 25-euro fee and 166.80 euros in legal costs, payable in thirteen instalments. Breach makes the whole obligation immediately payable and entitles the association to late-payment interest of 0.03% per day on the unpaid management-cost amount specified in the interest clause from 1 January 2025. The general costs clause leaves costs with participants; no separate reimbursement beyond the settlement was ordered.

Outcome of this decision

Settlement approved and proceedings terminated; joint and several instalments and conditional late-payment interest retained.
Translation of an anonymised, abridged excerpt from Estonian
2. Terminate proceedings in civil case no. 2-24-145726.

Narva linn, A. Puškini tn 5 korteriühistu · 80180523

Apartment association bills, payments and debtsDebt claimsInstalments and payment schedulesPayment accounting and set-off

How it started · editorial summary

The settlement provides for instalments and applies only payments exceeding current undisputed bills to the old debt.

· Order approving a settlementViru Maakohus · First instance · № 2-25-117421/3Read actFirst instance

Separate act page

A. Puškini tn 5: instalments and allocation of current payments

Order approving a settlement · Viru Maakohus · First instance

Narva linn, A. Puškini tn 5 korteriühistu · 80180523

Entry into force has not been reverified

Participants and roles: Applicant — Narva linn, A. Puškini tn 5 korteriühistu; Debtor — XX

How it started · editorial summary

The settlement provides for instalments and applies only payments exceeding current undisputed bills to the old debt.

The dispute and the court’s decision

Narva linn, A. Puškini tn 5 korteriühistu brought a claim against XX in payment-order proceedings. The participants agreed on the debt and payment, submitted a settlement and requested termination. Following transfer from Pärnu Maakohus, Viru Maakohus approved it on 27 August 2025. XX acknowledged the principal and undertook to reimburse 45 euros in association costs: 25 euros in state fees and 20 euros in other procedural costs. The association waived other claims. There are 33 monthly payments with seasonal amounts: higher from May to October and lower from November to April, with a separate final amount. Early payment is permitted. Performance of the schedule is not established. Current undisputed bills must be paid in addition: only the excess above them counts toward the old debt under the settlement. Full or partial delay in an instalment makes the entire unpaid balance enforceable. After performance, no mutual claims remain in the case. The court found the settlement permissible and enforceable and ended proceedings. Each participant bears other costs. The agreed appeal period was shortened to two days from service.

Outcome of this decision

Approve monthly payment of the principal and 45 euros in costs. Current undisputed bills remain separately payable; only the excess is applied to old debt. Full or partial delay makes the entire unpaid balance enforceable. End proceedings; participants bear other costs.
Translation of an anonymised, abridged excerpt from Estonian
1.5. If instalments specified in clause 1.2 are delayed, including in part, the entire unpaid debt is recoverable in enforcement proceedings (compulsory enforcement). […] 2. End the proceedings in civil case no. 2-25-117421.

Narva linn, Kangelaste prospekt 14 korteriühistu · 80175564

Apartment association bills, payments and debtsDebt claimsInstalments and payment schedulesLate-payment interest and consequences of delay

How it started · editorial summary

Debtor XX requested a schedule; after transfer, the participants submitted a signed agreement whose dates the court clarified.

· Order approving a settlement and ending proceedingsViru Maakohus Narva kohtumaja · First instance · № 2-25-115607/5Read actFirst instance

Separate act page

Kangelaste prospekt 14: instalments and late-payment interest

Order approving a settlement and ending proceedings · Viru Maakohus Narva kohtumaja · First instance

Narva linn, Kangelaste prospekt 14 korteriühistu · 80175564

Entry into force has not been reverified

Participants and roles: Applicant — Narva linn, Kangelaste prospekt 14 korteriühistu; Debtor — XX

How it started · editorial summary

Debtor XX requested a schedule; after transfer, the participants submitted a signed agreement whose dates the court clarified.

The dispute and the court’s decision

Narva linn, Kangelaste prospekt 14 korteriühistu sought a debt from XX through expedited payment-order proceedings. XX objected and requested a schedule. No agreement was initially submitted, so the case went to Viru Maakohus, which allowed time to correct the application or settle. On 8 August 2025, the participants submitted a signed settlement. The court approved a total obligation including costs and monthly payments. Its separate components and the reasons for reducing it from the original claim are not disclosed. The court removed a repeated date in the draft schedule so that only one payment fell in each month. This was the court’s own correction, which it considered did not alter the settlement’s substance. Delay attracts late-payment interest of 0.1% per day on the amount paid late. This is not an automatic acceleration of the whole balance. After proper performance, the association has no remaining property claims under the agreement. Proceedings ended; each bears other costs. The agreed appeal period is one day from service. Actual payment is not established.

Outcome of this decision

Approve the settlement covering the total debt including costs, monthly payments and late-payment interest of 0.1% per day on amounts paid late. The court corrected the repeated date and ended the proceedings.
Translation of an anonymised, abridged excerpt from Estonian
3. End the civil proceedings. […] 4. Leave each participant to bear litigation costs not specified in the settlement. There are no litigation costs to be reimbursed.

Narva linn, Tallinna mnt 17 korteriühistu · 80170377

Apartment association bills, payments and debtsDebt claimsBills and justification of chargesObligations of multiple ownersHeatingCalculation and allocation of heating chargesRepairs and shared propertyOrganisation and funding of repairs

How it started · editorial summary

The court checked the basis of charges and limited the recovery period.

· Court orderViru Maakohus Narva kohtumaja · First instance · № 2-24-15880/39Read actFirst instance

Separate act page

Proof of charges and joint and several recovery

Court order · Viru Maakohus Narva kohtumaja · First instance

Narva linn, Tallinna mnt 17 korteriühistu · 80170377

Entry into force has not been reverified

Participants and roles: applicant — Narva linn, Tallinna mnt 17 korteriühistu; three persons concerned XX — jointly and severally liable owners; association representatives XX

How it started · editorial summary

The court checked the basis of charges and limited the recovery period.

The dispute and the court’s decision

Narva linn, Tallinna mnt 17 korteriühistu sought joint and several payment from three persons XX for services, repair-fund contributions, gas-equipment maintenance and heating. This is one common sum, not separate full recovery from each. The court checked the claim despite incomplete responses. Meeting decisions, a management plan, contracts and supplier invoices supported the charges; bills sent to the owner alone are insufficient. Payments were credited. Debt for 1 June 2023–30 April 2025 was proved; debt from May 2025 was not awarded. The application was allowed in part. Of 850 euros sought for legal costs, 300 euros were accepted for proved representative activities; with a 50-euro fee, 350 euros were awarded jointly and severally. Duplicate documents were removed from the file.

Outcome of this decision

Proven debt and 350 euros in costs awarded jointly and severally; later debt not awarded.
Translation of an anonymised, abridged excerpt from Estonian
2. Allow the application of Narva linn, Tallinna mnt 17 korteriühistu in part.

Narva linn, Malmi tn 4 korteriühistu · 80189939

Apartment association bills, payments and debtsDebt claimsInstalments and payment schedulesLate-payment interest and consequences of delay

How it started · editorial summary

After payment-order proceedings began, the association and debtor XX agreed on the acknowledged obligation and additional time to pay.

· Order approving a settlementViru Maakohus Narva kohtumaja · First instance · № 2-25-111135/3Read actFirst instance

Separate act page

Malmi tn 4: acknowledgment of debt and additional time to pay

Order approving a settlement · Viru Maakohus Narva kohtumaja · First instance

Narva linn, Malmi tn 4 korteriühistu · 80189939

Entry into force has not been reverified

Participants and roles: Applicant — Narva linn, Malmi tn 4 korteriühistu; Debtor — XX

How it started · editorial summary

After payment-order proceedings began, the association and debtor XX agreed on the acknowledged obligation and additional time to pay.

The dispute and the court’s decision

Narva linn, Malmi tn 4 korteriühistu sought payment of debt and costs through expedited payment-order proceedings. After service of a payment proposal, the participants agreed on the obligation and instalments. Their signed text was submitted for approval and the case transferred from Pärnu Maakohus to Viru Maakohus. On 5 August 2025, the court approved the settlement. XX acknowledged unpaid management costs and accrued late-payment interest; the obligation also includes 25 euros in state fees and 166.80 euros in legal costs. The association granted additional time for fifteen voluntary monthly payments. Breach makes the entire obligation immediately payable. On breach, the association may demand the agreed late-payment interest of 0.02% per day on the originally acknowledged management-cost principal from 1 July 2025. The court found the settlement permissible and enforceable and ended the case. Participants bear other costs. The order does not establish that payments were made.

Outcome of this decision

Approve monthly payment of the acknowledged debt, late-payment interest, 25 euros in state fees and 166.80 euros in legal costs. Breach triggers immediate payment and late-payment interest of 0.02% per day on the originally acknowledged management-cost principal from 1 July 2025. End proceedings.
Translation of an anonymised, abridged excerpt from Estonian
1.4. The debtor acknowledges the obligation specified in clause 1.3 of the settlement. […] 2. End the proceedings in civil case no. 2-25-111135.